The CoolTank 2.0
Project background I started the project in January 2018 on the Bitcoin mining hype by purchasing a few ASICs from Bitmain. ASICs initially were located in the apartment but shortly were moved to the heat-insulated container with AC connected to industrial electricity in Jebel Ali (MFC). In April 2018, an overheating problem was raised and fixed by airflow management, but in May 2018, serious investments are required into the air cooling system. I had to stop mining until Oct